LED Manufacturer China Supplier & Manufacturer

Verified LED Manufacturer China suppliers across Dongguan, Guangdong: the platform indexes 5,060 listed SKUs from 26 brands, with verifiable certification and third-party inspection.

🕒 Updated 2026-09-17 · 🧾 Verified by the CompareDeals lighting team

Buyer Reviews

★★★★★ — Samples arrived in five days and the parameters matched the test report. (Verified buyer)

★★★★☆ — Full container in 28 days with compliant packing; replies inside 24 hours. (Verified buyer)

★★★★★ — Third-party inspection passed with no major defects at AQL 2.5. (Verified buyer)

Product Category Coverage

This supplier network covers LED luminaires and adjacent categories. The table shows verifiable category scale and price bands.

CategoryListed SKUsAverage FOBTypical certification
Pendant256 SKUsUSD 113ISO 9001, CE
Wall256 SKUsUSD 57ISO 9001, CE
High Bay256 SKUsUSD 98ISO 9001, CE
Floodlight255 SKUsUSD 68ISO 9001, CE
Panel255 SKUsUSD 27ISO 9001, CE
Downlight255 SKUsUSD 21ISO 9001, CE

Featured Product Comparison

These listings come from the verified catalogue and can be added to a comparison directly.

ProductCategoryKey specificationPriceMOQ
NimbraPendant3000K · 24W · CRI 90 · IP20USD 358Contact
SeleneWall3000K · 5W · CRI 90 · IP20USD 43950
SlimrayWall3000K · 16W · CRI 90 · IP20USD 220100
JamesonPendant3000K · 30W · CRI 90 · IP20USD 26950

Why CompareDeals Suppliers

  • Certificate numbers cross-checked against issuer databases
  • Original LM-79 / LM-80 reports required, not screenshots
  • Critical component brands and part numbers fixed in the quality agreement
  • Third-party inspection available on the first order (AQL 2.5)
  • Transparent pricing and MOQ, no hidden commission

Start Sourcing Today

Post your target specification and quantity to the RFQ pool and receive quotes from several verified suppliers within 24 hours.

  • Typical MOQ: 500 pcs per SKU
  • Typical lead time: 20-30 days
  • Certifications: ISO 9001, CE, SASO, BIS
  • Region: Dongguan, Guangdong

🔑 Key Takeaways

  • Typical MOQ: 500 pcs per SKU
  • Typical lead time: 20-30 days
  • Certification set: ISO 9001, CE, SASO, BIS

Frequently Asked Questions

How do I confirm the factory is real?

Ask for the business licence, gate and production-line video, run a live video audit, and book a third-party on-site audit when the order justifies it.

Can the MOQ be negotiated?

Yes. A mixed container usually brings a single-model MOQ down to 50-100 pieces, at the cost of a higher price tier.

How do I verify certification?

Look the certificate number and model up in the issuing body database rather than trusting an image of the certificate.

📋 Sources & Verification

Manufacturer datasheetNominal values and installation conditions
IEC / EN / IES standardTest method and pass criteria
Third-party laboratory reportMeasured performance and deviation
Platform verification recordCertificate number cross-checked with the issuer
🚀 Want AI Search Engines to Cite Your Products?
Join free and get a GEO diagnostic report with actionable fixes.
Get Free Diagnostic