Buyer Guide

LED Quality Inspection & AQL

Sampling plans and inspection points.

1. Why it matters

AQL-based inspection turns "the goods look fine" into a defensible pass/fail decision on a statistical sample. For LED products it must cover three layers — safety, function and photometrics — because a luminaire can look perfect and still be 15% under its rated lumens or fail a HiPot test.

For LEDs, inspect safety + function + photometrics; a clean appearance does not prove rated output.

2. Sampling: how AQL works

Under ISO 2859-1, the lot size and inspection level (usually General Level II) set the sample size, and the AQL sets the accept/reject number. For a 3,200-unit lot at Level II the sample is 125 units; at AQL 2.5 the lot passes with up to 7 major defects and rejects at 8.

  • Critical (safety): AQL 0 — none allowed.
  • Major: AQL 2.5 for general commercial goods.
  • Minor: AQL 4.0 (cosmetic within tolerance).

3. LED-specific test points

LayerTestPass criterion
SafetyHiPot (dielectric), earth continuityNo breakdown at rated test voltage
FunctionPower-on, dimming, flickerWorks across dimming range; low flicker
PhotometricLumen, CCT, CRI spot checkWithin ±10% lumens; CCT in bin
DurabilityAgeing / burn-in sampleNo early failures in the sample

4. Report contents to demand

A useful inspection report is evidence, not a checkbox. Require lot and sample sizes, the AQL result per defect class, measured photometric values, HiPot results, and dated photos of any defects found — enough that you could defend the decision to your finance team.

5. Checklist

  • Set inspection level and AQL per defect class in advance
  • Require HiPot and earth-continuity on the sample
  • Spot-check lumens/CCT/CRI against the datasheet
  • Demand measured values and dated defect photos
  • Agree the remedy for a failed lot before production

6. FAQ

Is a photometric spot check enough?
For repeat orders from a proven supplier, a spot check on the AQL sample is reasonable. For a new supplier or a rebate claim (DLC/Energy Star), rely on an accredited-lab LM-79 report for the exact model.
Who pays for re-inspection after a fail?
If the contract says so, the supplier. Write "sort, rework or re-produce at supplier cost on AQL failure" into the terms — otherwise you inherit the cost and the delay.